Skip to main content
    DevOps
    Way of Working
    1. Home
    2. Roadmap
    3. Acceleration
    4. Pipeline Security Perf

    Secure & Performant Build Pipelines

    Acceleration Milestone
    Phase: build
    DF
    LT
    CFR

    Build pipeline optimization with parallelization, signed artifacts, SLSA provenance, supply chain security, and extended vulnerability scanning.

    Business Value

    Maintains <10 minute build times while adding security checks and reduces container vulnerabilities by 95% through automated scanning and caching

    DORA Impact

    • Deployment Frequency
    • Lead Time
    • Change Failure Rate

    Key Features

    • Signed Build Artifacts
    • SLSA Provenance Generation
    • CI Pipeline Hardening
    • Intelligent Build Caching
    • Multi-Layer Container Scanning

    Who

    platform
    engineer
    security

    When

    Acceleration (90-180 days)

    Capabilities in This Epic

    1.

    Signed Build Artifacts

    100% of production artifacts cryptographically signed using cosign or similar tool with signature verification enforced.

    Target: 100% artifacts signed and verified
    2.

    SLSA Provenance Generation

    >= 80% of builds generate SLSA Level 2+ provenance with builder identity, materials, and build metadata.

    Target: >= 80% builds have SLSA L2+ provenance
    3.

    CI Pipeline Hardening

    >= 90% of pipelines use immutable build environments, least-privilege service accounts, audit logging enabled.

    Target: >= 90% pipelines hardened
    4.

    Intelligent Build Caching

    >= 80% of builds use multi-layer caching (dependencies, intermediate artifacts) reducing build time by >= 40%.

    Target: >= 40% build time reduction via caching
    5.

    Multi-Layer Container Scanning

    100% of container images scanned for OS vulnerabilities, malware, misconfigurations with >= HIGH blocking deployment.

    Target: 100% images scanned, HIGH+ blocks deploy

    Implementation Journey

    Prerequisites

    Complete these before starting:

    • CI/CD baseline epic complete (functional pipelines)
    • Security scanning tools identified
    • Performance baseline targets defined

    Typical Timeline

    4.5 weeks

    Effort Estimate

    170 hours
    ≈ 21 days

    Breakdown by role:

    Platform:80 hours
    Security:50 hours
    Engineering:40 hours

    Team Composition

    Cross-functional team including: platform, engineer, security

    Applicable Environments

    regulated
    non-regulated

    Success Metrics

    Entry Criteria

    Prerequisites to start implementing this epic:

    CI/CD baseline epic complete (functional pipelines)
    Security scanning tools identified
    Performance baseline targets defined

    Exit Criteria

    Criteria defined at the Acceleration milestone level:

    deployment Frequency: >= daily (non-critical prod)
    lead Time: <= 24h (commit to prod non-critical)
    change Failure Rate: <= 10%
    mttr: <= 1h
    slo Coverage: >= 95% services with SLOs
    policy Coverage: >= 70% changes pass automated checks
    progressive Delivery: >= 80% rollouts
    error Budget Policy: enforced on all SLOs
    slsa Level: >= 2
    dr Drills: quarterly (RTO/RPO met)
    pr Cycle Time: p50 <= 8h
    artifact Verification: signatures verified at deploy

    DORA Metrics Impact

    DF
    1/week to 1/day
    7x
    LT
    7 days to 2 days
    71%
    CFR
    20% to 10%
    50%

    Resources

    Implementation Kit

    Step-by-step guide, templates, and tools for this epic

    View Secure & Performant Build Pipelines Implementation Kit

    Templates

    Ready-to-use templates for implementing capabilities

    Browse All Templates

    Learn More

    Tutorials & Learning PathsCase Studies & Examples

    Common Pitfalls

    Security scans added to pipeline, builds now too slow
    Mitigation: Run expensive scans (DAST) nightly or on main only. Parallelize scans. Cache scan results. Target: <15 min builds.
    Container image scanning finds vulnerabilities post-deployment
    Mitigation: Scan images before pushing to registry. Block vulnerable images. Use minimal base images (alpine, distroless).
    Pipeline caching misconfigured, cache always invalidates
    Mitigation: Use stable cache keys (lock file hash). Validate cache hits in metrics. Separate dependency cache from build cache.

    Next Steps

    After Completing This Epic

    Once you've met all exit criteria, consider these next steps:

    • Review metrics to validate DORA improvements
    • Document lessons learned and update team playbooks
    • Share success stories with other teams

    Continue To

    The natural next epic in the roadmap sequence:

    Advanced Testing & Performance Validation

    Alternative Paths

    Other epics that can be tackled in parallel:

    Continuous Planning & Compliance IntegrationSecure Code & Advanced ReviewAdvanced Testing & Performance ValidationAdvanced Release Coordination
    DevOps
    Way of Working

    DevOps practices for the entire delivery lifecycle

    © 2019-2026 devopswow.com. Created by Burhan Öcüt

    PartnersAboutPrivacyTermsCookies